Currie High School
Published: 1 September 2023
At Currie High School in Edinburgh, GR Contracts undertook an impressive 900 tonnes of structural steelwork, metal decking and intumescent fire protection. The sheer size of the project and the diverse range of materials used demonstrates the high standard of workmanship provided by the team. From the spark of an idea to the intricate details of the finished product, they worked diligently to ensure that all requirements were met to the highest possible standard. The result is an awe-inspiring structure that is both aesthetically pleasing and highly functional. With this kind of attention to detail, it is no wonder that GR Contracts are most sought-after in the country.